Archivo de la categoría: borrrar

WE ARE STARTING !!! P2_DESIGN STUDIO_CO-HOUSING IN BARCELONETA

Welcome to this new course of P2_DESIGN STUDIO, 2017-18.

This semester we are going to work in a very singular area in Barcelona, in Barceloneta. We will be exploring the complexity of the site with a program of co-housing and coworking, as a situation that involves neighbourhood and urban planning in a very active problem.

Anuncios

Deja un comentario

Archivado bajo borrrar

References_INTERNATIONAL CENTER FOR SPORTS INNOVATION IN THE NATURAL ENVIRONMENT “THE RING”

SONY DSC

INTERNATIONAL CENTER FOR SPORTS INNOVATION IN THE NATURAL ENVIRONMENT “THE RING”

(text from the author’s website; http://www.jmsg.es/THE-RING)

The project develops a program of technical sports centre (R & D) about sports related to nature. The site lies on a thickly wooded peninsula in the Gabriel y Galán reservoir in Cáceres. The place is subject to periodic variation of the water level. Therefore, the location of the building is set from a certain height.

Landscape

The integration of the project in the environment takes place primarily through two strategies: scale and materialization.

The program, about 6,000 m2, stretches becoming a circular structure of 630 meters. This achieves that the building is always perceived in a partial way. A fragment explains the building, but the only way to see the whole of it, is from above. The excessive scale dilutes the project in the environment. In addition, the building becomes an artefact. It is materialized by a system of dry construction with assembled parts. It is integrated into the landscape by contrast.

Moreover, the building rises from the ground without changing the topography. Thus, the impact on the place is almost null. Contact points are reduced to a minimum, establishing a single high level over the ground. Its alien character to environment is underlined while establishing a varied and complex spatial relationship with the topography. The elevation of the pillars varies from 1 to 4.50 meters.

Geometry

The strategy followed is to collect the program in a single structure. Using a circular geometry, we place the program as close as possible to the water border. The project is located in a seven meters span. The program is distributed as separate modules that are hosted together between the two ring planes.

The continuous facade is altered by opening holes at irregular intervals. These empties divide the program areas and allow the communication by elements, both vertically and horizontally. The modules, called work-places, face the water and appropriate the adjacent land. Having its own access to water allows developing sport activities independently. The independent program generates diagonal relationships between them, making unnecessary an internal circulation in the ring. The ring is which organizes the complex.

Construction

We use local both techniques and building systems. All the construction is based on standardized and prefabricated steel profiles similar to traditional constructions from farms and small local industry.

Like giant pieces of meccano, the steel components were brought into the site and simply and rapidly put together. The execution time of the work was six months. The work is best understood as an assembly of pieces than like an ordinary construction. This was achieved through a systematization and standardization of building systems throughout the project. Because of its size, the circular structure could be solved by standardized straight elements; there is no curve in the project.

Stainless steel cladding panels of the facade have a certain angle. These gills give a chameleon-like feature that allows the change of the image of the building throughout the day reflecting different sheens and hues.

Deja un comentario

Archivado bajo borrrar

PROYECTOS 3_2016-17. Entrega final

El pasado viernes  18-11-16 el curso terminó con la presencia del Jury Invitado: Vicente Sarrablo y Jaume Prat.

Felicidades a todos por el trabajo realizado !

 

Deja un comentario

Archivado bajo borrrar

PROYECTOS 3_2016-17 EMPEZAMOS !!!

Hola a todos !
Este viernes empezamos el curso.
Nos vemos en el Aula 201 a las 9:00 para la presentación del curso y del nuevo ejercicio.

Hasta pronto 🙂

Deja un comentario

Archivado bajo borrrar

P4_ENTREGA INTERMEDIA 06-03-2015_CONTENIDO

Hola a todos,

Os adjuntamos el contenido de la próxima entrega intermedia del viernes 06-03-2015.

Suerte !

P4_2014-15_ENTREGA INTERMEDIA 06-03-15

  • FORMATO A1 (todo vertical)
  • ENTREGA DROPBOX: máx 7mb, 300 dpi, 1 único archivo pdf. Esta entrega es obligatoria y se podrá realizar hasta el 09-03-15)

DOCUMENTACIÓN ENTREGA

  1. ANÁLISIS DEL LUGAR (1x A1)

1.1. Diagramas:

  • Estado actual vs estado propuesta (tejido urbano, usos, vacío-lleno, espacios públicos, viario, accesos, etc)
  • De proyecto (estrategia de implantación, justificación de la organización del programa, volumetría, etc). En planta y/o sección y/o axonometría.
  1. EMPLAZAMIENTO GENERAL. PLANTA CUBIERTA (1x A1)

2.1. Planta Master Plan con inclusión del proyecto E:1/10000 y E:1/2000

2.2. Secciones generales con contexto urbano (las necesarias para el proyecto). E:1/10000 y E:1/2000

  1. PLANTAS Y SECCIONES. E:1/100 ó E:1/150 ó E:1/200 (en función del proyecto)

(número de A1 necesarios)

3.1. Planta baja (con entorno)

3.2. Plantas tipo (equipamiento y viviendas/apartotel/hotel)

3.3. Secciones generales (con entorno)

3.4. Planta pàrquing E:1/500

  1. ALZADOS Y MATERIALIDAD

(número de A1 necesarios)

4.1. Alzados (E:1/100 ó E:1/150 ó E:1/200 (en función del proyecto); la misma escala que plantas y secciones)

  1. TIPOLOGÍAS VIVIENDA-APARTHOTEL-HOTEL E:1/50 (1x A1)

5.1. Planta y sección de todas las tipologías diferentes.

  • Con definición gráfica de elementos constructivos
  1. IMÁGENES *(opcional y recomendable)

6.1. Exterior + Interior

  1. MAQUETAS

7.1. Maqueta del conjunto Master Plan + Proyecto. E 1/1000 (con entorno)

7.2. Maqueta volumetría. E 1/500 (con entorno inmediato)

7.3 Opcional: maquetas parciales E:1/200

*material mínimo exigible

Deja un comentario

Archivado bajo 0 Studies (t), borrrar, Degree in Architecture

P4_ALGUNAS NORMAS ….

Hola a todos,
Adjuntamos links a algunas normas básicas que os seran útiles en el proyecto.

Habitabilitat 2009_PAG 11-16

CTE_SEGURETAT UTILITZACIO_APARCAMENT_2009

CTE_Accessibilitat_2009

CTE_INCENDIS_2009

CTE_HABITABILITAT_2009

Deja un comentario

Archivado bajo 0 Studies (t), borrrar, Degree in Architecture

P4_CONTENIDO ENTREGA 20-02-15

Hola a todos,

Como se ha comentado hoy en clase, la próxima semana la entrega de Proyectos 4 consistirá en:

FORMATO A2 (todo vertical o horizontal):

– Implantación: planta baja con entorno 1/200

– Programa: sección/axonometría/plantas con diagrama de la organización del programa en colores.

– Plantas tipo con las tiipologías de vivienda/aparthotel/hotel 1/100

– Volumetría: maqueta 1/500 con entorno inmediato

Suerte

Deja un comentario

Archivado bajo 0 Studies (t), borrrar, Degree in Architecture